A data center tycoon · PC

Data Center Inc.

Out on Steam Thursday, December 17, 2026

It's 2005 and you rent a closet with a power strip. Sign customers, rack servers, keep the room cool and the lines up through thirty years of real hardware. Grow into a building you own, build secure cages for big clients and buy out your rivals.

Run a data center, from a closet to a campus

It's January 2005. You have a rented office closet, a starting loan and one phone line ringing with your first customer. Negotiate the deal, buy the server, have it racked in time, and keep it running. Thirty years later you could own the building, the hall next door, sites in other regions and half your competitors.

Every rack is yours to place

  • Buy 42U racks and fill them with real-era hardware: servers, switches, firewalls, GPU servers and mining rigs.
  • Place racks, air conditioning, power panels, UPS units, generators and fuel tanks yourself. Heat is a live map, and airflow matters: hot and cold aisles keep your servers alive.
  • Move up from the office closet to a back room, a small suite, a data hall floor and finally your own building.

Uptime is the product

  • Every customer signs an SLA: 99%, 99.9% or 99.99%. Miss it and you pay credits and lose reputation.
  • Storms, ice, heatwaves, hurricanes and regional grid collapses take the power down. Cooling failures, DDoS attacks, intrusions and break-ins test your preparations.
  • Hire technicians, support reps, site managers, platform engineers and security guards, and watch them walk the floor fixing things at 3 AM.

Big customers, racks of their own

  • Dedicated racks: a customer rents a whole rack of the year's densest servers, with its own firewall and a dedicated line.
  • Secure cages: three racks behind a chain-link fence with a card-reader gate, cameras on the fence posts and guards on duty around the clock.

Thirty years of tech and money

  • Hardware generations from single-core boxes to 96-core servers, a 10 Mbps DSL line to 400 Gbps transit, IX peering, IPv4 exhaustion.
  • Research virtualization and containers, pack customers' VMs onto fewer hosts and live-migrate them with no downtime.
  • Rent GPU servers to render farms and AI companies, or point idle cards at a volatile cryptocurrency.
  • Real books: rent, power, transit, wages, depreciation, monthly tax, loans, insurance and certifications such as SOC 2, PCI DSS and HIPAA.

Race the market

  • Up to thirty rival companies rise and fall over the decades, and the cloud giants arrive and drive prices down.
  • Buy shares in rivals, take control, and move their customers onto your floor. Climb the valuation leaderboard.

Your game, your pace

  • Eight starting regions set the difficulty: cheap power with a shaky grid, cheap rent with hurricanes, EU data residency, or the most expensive floor space in the game.
  • Choose when it ends (2015, 2025, 2036, 2050 or endless). Pause any time or play at up to 3× speed.
  • A walk-through tutorial and an in-game help wiki explain every system.

Screenshots

Launch day is December 17

Wishlist on Steam so you hear the moment it's out, and join the Discord to talk to the developers, report bugs and share your data hall.

Join our Discord